Utica College Student Center
Size:
4,200 SF
4,200 SF
Location:
Utica, NY
Utica, NY
General Contractor:
The Hayner Hoyt Corporation (Syracuse, NY)
The Hayner Hoyt Corporation (Syracuse, NY)
Roof System Installed:
Firestone UC-14 Standing Seam Metal
Firestone UC-14 Standing Seam Metal
This project required the (2) layers of existing asphalt shingles to be removed down to the wood plank roof deck. Apple mechanically fastened (2) layers 2.6” rigid insulation and installed the Firestone UC Snap Panel Standing Seam roof and related trims over full ice and water shield underlayment, along with a Dynaguard snow retention system.

Back to Projects